Skip to main content
Browse
Collections
Gallery
About
Contact
Search
Advanced search
6 objects
Sort by:
Identifier
|
Title
|
Date
|
Relevance
PDF Checklist
Skip to Result Filters
8692
DRIVING PILES AND FORM WORK FOR TURRET FOUNDATIONS AT SEA WALL BET DRY DOCKS 1 AND 4 ALLOT 7X127-1-4 YARD LABOR
8691
CLOSE UP VIEW OF REINFORCEMENT OF FOOTINGS FOR WELDING SHED AT SEAWALL BETWEEN DRY DOCKS 1 AND 4 ALLOT 7X127 – 4 – 10 YARD LABOR
8672
GENERAL VIEW OF FOUNDATIONS FOR WELDING SHED AT SEA WALL BETWEEN DRY DOCKS 1 AND 4 ALLOT 7X127 – 4 – 10 YARD LABOR
8631
TURRET FOUNDATIONS AT SEAWALL BETWEEN DRY DOCKS 1 AND 4 ALLOT 7X127-1-4 YARD LABOR
3648
DRIVING PILES AND FORM WORK FOR NEW TURRET FOUNDATIONS AT SEA WALL BETWEEN DRY DOCKS NO 1 AND 4 ALLOT 7X127-1-4
3542
FORMS FOR NEW TURET FOUNDATIONS AT SEA WALL BET DRY DOCKS 1 AND 4 ALLOT 7X127-1-4 YARD LABOR
Search within
Filter by
Dry Dock 4
Bureau of Yards and Docks, Department of the Navy
1930s
Foundations
Start Over
Object Type
Photographs (6)
Date
1938 (6)
subject
Berth 6 (4)
Buildings (4)
Dry Dock 1 (4)
Dry Dock 4 (4)
Equipment (3)
Labor and Yard Workers (1)
Materials (4)
Projects (4)
Ships and Vessels (3)
Subsurface (1)
Waterfront (5)
place
Dry Dock 1 (6)
Dry Docks (6)