Skip to main content
Skip to Result Filters
6009NAVAL HOSP, NY, PHYSIOTHERAPY DEPT, DION, KNEE BAING CENT, FRACTURE WITH TRACTORS TO OVERCOME OVER-RIDING, ABSOLUTELY STIFF, SHOWING RESULT AFTER 5 WEEKS TREATMENT IN PHYS TER. ETHRIDGE, ARTHRITIS, ABSOLUTELY STIFF, 4 WEEKS, 10 DEGREES MOTION OBTAINED
Filter by
- Building 1 - Lyceum, Commandant's Office (1)
- Building 120 - Oil Storehouse, Salvage, Ordnance and Electrical Equipment Storage, Post Office, Services to Ships Afloat, Supply Sales, Cafeteria (3)
- Building 123 - Power House, Storeroom and Machine Division, Copper Shop, Central Tool Shop, Machine Shop (2)
- Building 128 - Machine Shop (14)
- Building 131 - Storehouse, Riggers, Shipwright, Sawmill and Electrical Machine Shop, Yard Basin Office, Spar and Block House, Duty Office, Joiner Shop and Paint Shop, Sheetmetal Shop, Storage, Sail Loft (4)
- Building 4 - Ship House D (c. 1862-1893) (2)
- Buildings (26)
- Hospital Campus (11)
- Hospital Quarters F (11)